AI That Completes Safety Paperwork Meticulously
Snap a photo of your own paperwork or start from one of ours — either way, the AI reads it and flags what's missing: hazards without controls, PPE that doesn't add up, steps that don't match your state's regs.
No credit card or registration details required. Instant Google sign in · or browse free templates by trade
You stay in full control
AI proposes risk assessments with justifications and citations for your review, then audits your inputs and flags what still needs your eyes — you land on a document that's been checked, not just filled in.
AI proposes each hazard, control and HRCW mapping with a justification and citation, then you review and confirm it before it counts.
AI audits your inputs for gaps — controls that don't match the hazard, PPE that doesn't add up, missing sign-offs — and flags them for you to resolve before publishing.
A huge range of safety paperwork
SWMS
Safe Work Method Statements
Pre-filled per trade, checked for gaps, signed by your crew via QR code.
JSEA
Job Safety & Environmental Analysis
Task-by-task hazard and environmental sign-off — the format some principal contractors ask for instead of a SWMS.
JHA
Job Hazard Analysis
Same idea as a JSA under a different name — some contracts still ask for it by this label instead.
SOPs
Safe Operating Procedures
Step-by-step operating procedures for the plant and equipment your crew runs every day.
Prestart checklists
Plant & equipment prestart checks
Daily prestart checks logged against the job, not lost in a glovebox.
Toolbox talks
Site briefings & attendance
Quick pre-shift briefings with an attendance record, tied back to the project file.
Take 5
Pre-task personal check
A 60-second stop-look-assess check your crew does before starting a task — on top of the SWMS, not instead of it.
Working at Heights permit
Fall-risk permit & sign-off
A standalone permit for roof, edge and ladder work, separate from the SWMS control that covers it.
Confined Space Entry permit
Entry permit & atmosphere check
Gas testing, entry log and standby person recorded before anyone goes into a tank, pit or trench.
Hot Work permit
Welding, cutting & grinding sign-off
Fire watch and flammable-material checks recorded before hot work starts near anything that burns.
Excavation permit
Dial Before You Dig sign-off
Underground services checked and cleared before the first cut, with the search results attached.
Demolition Work Plan
Structural demolition sequence
The staged plan WHS Regs require before load-bearing or structural demolition work begins.
Asbestos Removal Control Plan
Licensed asbestos removal
The control plan required before licensed asbestos removal work starts on site.
Electrical isolation
Live work & isolation sign-off
Isolation points and test-before-touch steps recorded before anyone works near live electrical.
Hazardous chemical risk assessment
SDS-based chemical risk assessment
The risk assessment WHS Regs require wherever hazardous chemicals are stored or used on site.
Manual handling risk assessment
Hazardous manual tasks
Lifting, carrying and repetitive-task risks assessed for jobs that put backs and shoulders on the line.
Noise risk assessment
Exposure to excessive noise
Assessed wherever plant or tools push noise exposure past the safe daily limit.
Silica dust risk assessment
Respirable crystalline silica (RCS)
Exposure controls for cutting, grinding or drilling engineered stone, concrete or masonry.
Fatigue management
Extended hours & remote work
Shift length, travel and rest breaks assessed for long days, FIFO and remote jobs.
WHS Management Plan
Whole-of-project WHS plan
The overarching plan most head contracts require before a subbie's crew steps on site.
Site-Specific Safety Management Plan
Site-specific safety plan (SSMP)
A tailored safety plan for one site, often requested by principal contractors alongside the SWMS.
Environmental management plan
Construction environmental plan (CEMP)
Erosion, sediment and spill controls recorded for jobs near waterways or sensitive sites.