Free site safety templates to Australian standards
Pre-filled job steps, hazards and controls for the trades doing the real work. Pick yours, edit it free, and get it signed on site when you're ready.
SWMS
Safe Work Method Statement for high-risk construction work.
JSEA
Job Safety & Environmental Analysis — the format some principal contractors ask for instead of a SWMS.
JHA
Job Hazard Analysis — same idea as a JSA under a different name.
SOPs
Safe Operating Procedures for the plant and equipment your crew runs every day.
Prestart checklists
Daily prestart checks for plant and equipment, logged against the job.
Toolbox talks
Quick pre-shift briefings with an attendance record, tied back to the project file.
Take 5
A 60-second stop-look-assess check your crew does before starting a task.
Working at Heights permit
A standalone permit for roof, edge and ladder work.
Confined Space Entry permit
Gas testing, entry log and standby person recorded before anyone goes into a tank, pit or trench.
Hot Work permit
Fire watch and flammable-material checks recorded before hot work starts near anything that burns.
Excavation permit
Dial Before You Dig sign-off with underground services checked and cleared.
Demolition Work Plan
The staged plan required before load-bearing or structural demolition work begins.
Asbestos Removal Control Plan
The control plan required before licensed asbestos removal work starts on site.
Electrical isolation
Isolation points and test-before-touch steps recorded before anyone works near live electrical.
Hazardous chemical risk assessment
The risk assessment required wherever hazardous chemicals are stored or used on site.
Manual handling risk assessment
Lifting, carrying and repetitive-task risks assessed for jobs that put backs and shoulders on the line.
Noise risk assessment
Assessed wherever plant or tools push noise exposure past the safe daily limit.
Silica dust risk assessment
Exposure controls for cutting, grinding or drilling engineered stone, concrete or masonry.
Fatigue management
Shift length, travel and rest breaks assessed for long days and remote jobs.
WHS Management Plan
The overarching plan most head contracts require before a subbie's crew steps on site.
Site-Specific Safety Management Plan
A tailored safety plan for one site, often requested by principal contractors alongside the SWMS.
Environmental management plan
Erosion, sediment and spill controls recorded for jobs near waterways or sensitive sites.
No templates match your search.